Step 3 — Amendment of the Anggaran Dasar (articles of association) if the industrial KBLI is not yet covered: document preparation and coordination with a partner notary.
- RUPS/shareholder resolutions.
- Draft amendments to the purposes and objectives.
- Identification of management and shareholders.
Step 5 — Meeting basic requirements: KKPR for the activity location.
- KKPR application in OSS.
- Proof of control over the land.
- Location map and coordinates.
Step 6 — Meeting basic requirements: Persetujuan Lingkungan (environmental approval) according to the scale of impact (SPPL / UKL-UPL / AMDAL)
- Description of the production process and waste types.
- Limbah B3 (hazardous and toxic waste) management plan, if any.
- Environmental documents appropriate to the scale.
- Proof of KKPR as an attachment.
Step 7 — Meeting basic building requirements: PBG and SLF for the factory/warehouse used.
- Technical planning drawings.
- Structural and utility documents.
- Proof of ownership/control of the land.
- Construction supervision report for SLF.
This list is generated from the same service data as the service page, so the two cannot disagree. If your company's circumstances are unusual the list can grow — we tell you before work starts, not midway.
See the serviceAll checklists