Step 2 — You submit operational data for the current period, organized according to the items for the construction stage or production stage, depending on your company's category. Submit BEFORE the 1st, not after.
- PRODUCTION STAGE — investment value excluding land and buildings; production capacity; installed capacity; production (and sales for the medium and large category); raw materials; auxiliary materials; investment value in land and buildings; workforce.
- PRODUCTION STAGE, utility data — raw water use for production processes; fuel and lubricant use; electricity use for production; owned power generation facilities and electricity sold (Medium and Large category)
- PRODUCTION STAGE, specifically for the Medium and Large category — ownership percentages; expenditure; production and distribution plans; machinery/equipment; waste treatment; and INDI 4.0 assessment.
- CONSTRUCTION STAGE — planned installed capacity; planned raw material requirements; construction implementation plan; workforce during the development/construction stage; planned workforce for the production stage; investment; and planned energy and raw water requirements.
- INDUSTRIAL SERVICES — planned or actual service capacity; sales/commercialization of industrial services; investment value with and without land and buildings; workforce; electricity use.
- SHIPYARD — newbuilding and repair facilities; newbuilding and repair capacity; use of raw materials and components.
- Documents supporting the figures: production summary, raw material usage summary, electricity and water bills, machinery list, and workforce summary at period-end.
Step 4 — Submission of Data Industri (industrial data) through SIINas during the open submission window. Komplia's target: the 3rd–5th, to leave time for clarification and the only opportunity to make corrections.
- Your company's SIINas account.
- Draft entries approved by the person in charge.
- Supporting documents requested by the system.
This list is generated from the same service data as the service page, so the two cannot disagree. If your company's circumstances are unusual the list can grow — we tell you before work starts, not midway.