Step 2 — Meeting basic requirements for the location and building.
- Proof of rights to the land/building or a lease agreement.
- KKPR.
- UKL-UPL (inpatient) or SPPL (outpatient)
- PBG and SLF.
- Clinic floor plan and site plan.
Step 3 — Meeting minimum room requirements for Klinik Utama.
- Administration room, waiting room, examination room, treatment room, lactation room, toilets, parking area.
- Examination/treatment rooms of at least 7.2 m2 each (2.4 m x 3 m)
- Dental and oral treatment room of at least 9 m2 for one dental unit.
- For inpatient care: inpatient rooms, emergency room, staff room, pharmacy installation, laboratory room, and nutrition kitchen.
- Emergency room with a treatment bed, emergency kit, and oxygen outlet/cylinder.
Step 4 — Recruitment and licensing arrangements for specialist personnel.
- List of specialist medical personnel, healthcare personnel, and support staff.
- A valid STR.
- SIP for the clinic's location, or an employment contract + a letter committing to arrange the SIP for a new clinic.
- For inpatient care: pharmaceutical personnel (pharmacists), nutrition personnel, and medical laboratory technology personnel.
- RPTKA if you employ foreign workers.
Step 9 — Post-issuance obligations: clinic registration, RME/SATUSEHAT, reporting, and scheduling accreditation.
- Application for clinic registration.
- Electronic medical records system.
- Clinic accreditation plan.
This list is generated from the same service data as the service page, so the two cannot disagree. If your company's circumstances are unusual the list can grow — we tell you before work starts, not midway.
See the serviceAll checklists